Russo Electrical consolidated the home’s main switchboard and separate add-on enclosures into a larger, clearly labelled load centre, with covered spare spaces for future circuits.

SERVICED BY RUSSO ELECTRICAL TEAM
Russo Electrical team
Project overview

Switchboard replacement to support new air conditioning

The problem

Multiple switchboard enclosures

The home needed a new feed for air conditioning, while the main board had separate enclosures for the pool, pool heat pump, EV charger and new oven.

The work

New three-row load centre

Replaced the existing arrangement with one larger switchboard load centre and ran the new electrical feed for the air conditioner.

The result

Tidy, labelled circuits

Circuits are brought together and clearly labelled, with covered spare spaces available for future circuits.

01 · The problem

A new air conditioner needed its own electrical feed

The owners of this Putney home were having air conditioning installed, and it needed a new electrical feed. Their switchboard consisted of a main board with several smaller enclosures alongside it, including enclosures labelled for the pool, pool heat pump, EV charger and new oven.

02 · How we fixed it

One larger, three-row switchboard load centre

We replaced the old arrangement with a new three-row switchboard load centre, bringing the circuits together in a single larger enclosure. We also ran the new electrical feed required for the air conditioner.

Every circuit is labelled, and spare covered spaces leave room for future circuits. For homeowners planning similar changes, the NSW Government’s electrical safety guidance explains why electrical work must be completed by a licensed electrician.

03 · The result

A cleaner switchboard layout, ready for the air conditioner

Instead of a main board surrounded by add-on boxes, the home now has one tidy, clearly labelled switchboard, with the new air conditioning feed in place.

For more information about local residential electrical services, visit our Putney electrician page. You can also read about electrical compliance requirements in NSW, including Certificates of Compliance for Electrical Work.

Before and after

From separate enclosures to one labelled load centre

Side-by-side before and after photographs of the Putney switchboard load centre replacement
BEFOREAFTER
Before: the old main board with separate add-on enclosures beside it. After: the new three-row board with labelled circuits.
Finished three-row Putney switchboard with protective covers closed
The finished board with its protective covers closed.
Customer questions

Questions about this Putney switchboard upgrade

Why did this Putney home need electrical work before air conditioning installation?

The new air conditioner needed an electrical feed, so the homeowners arranged for a switchboard update and the new feed to be installed.

What happened to the separate enclosures beside the old main board?

The existing arrangement was consolidated into one larger three-row switchboard load centre, bringing the circuits together.

Does the new switchboard have space for additional circuits?

Yes. The finished three-row load centre has spare covered spaces for potential future circuits.

Can Russo Electrical quote on a switchboard upgrade in Putney?

Yes. Learn more about our electrical services in Putney, request a booking or call 0485 009 500 to discuss your switchboard requirements.

Need a switchboard upgrade in Putney?

Contact Russo Electrical for a quote about replacing or upgrading your home’s switchboard.